Science Fair

Grown-ups

🗓️ Two weeks, one week or one weekend: three plans

Every project has the same five jobs, and the days you have decide how they spread out. Here are three plans, for a weekend, a week and two weeks, one of them for Does a paper bag make a banana ripen faster?.

🥽 Try it with: Does a paper bag make a banana ripen faster?

The five jobs

  • 🧺 Gather what you need and print your sheets.
  • 🧪 Do the test: the first try at every level.
  • 🔁 Do it again until every level has its tries.
  • ✏️ Find the middle numbers, draw the graph, write the conclusion.
  • 🪧 Make the board.

The jobs always go in this order, and none gets skipped. When time is short they share days. When there's time to spare, the spare days go between the testing and the writing, so the board never gets done in a rush.

Count your days, then take away three for gathering, writing and the board. What's left is your testing time. Day 1 below is the day you start, and the fair is the day after the last one.

One weekend

The fair is on Monday and it's Saturday morning. You need a project that tests in a single day, like Which ball bounces the most times?. Here's its plan:

  • Saturday: 🧺 Gather what you need and print your sheets.
  • Saturday: 🧪 Do the test: the first try at every level.
  • Saturday: 🔁 Do it again until every level has its tries.
  • Sunday: ✏️ Find the middle numbers, draw the graph, write the conclusion.
  • Sunday: 🪧 Make the board.

94 projects fit a weekend. Here are the easiest:

See them all on the one-weekend page.

One week

With seven days you can do your tries on different days, which is better science anyway. Here's the plan for Does a paper bag make a banana ripen faster?, which takes 4 days of testing:

  • Day 1: 🧺 Gather what you need and print your sheets.
  • Day 2: 🧪 Do the test: the first try at every level.
  • Days 3 to 5: 🔁 Do it again until every level has its tries.
  • Day 6: ✏️ Find the middle numbers, draw the graph, write the conclusion.
  • Day 7: 🪧 Make the board.

These need more than a weekend, but less than a week, of testing:

Everything that fits is on the one-week page.

Two weeks or more

Two weeks opens up the projects that grow. Where does grass come up first: a sunny window, a shady room or a dark cupboard? takes 10 days of testing, and its plan looks like this:

  • Day 1: 🧺 Gather what you need and print your sheets.
  • Day 2: 🧪 Do the test: the first try at every level.
  • Days 3 to 11: 🔁 Do it again until every level has its tries.
  • Day 13: ✏️ Find the middle numbers, draw the graph, write the conclusion.
  • Day 14: 🪧 Make the board.

The projects that need more than a week:

Keep a logbook every day, even the days you only look. A dated line each day (what I did, what I saw, what I think) shows a judge the work happened over time. Print the logbook sheet, and see everything for two weeks or more.

Let the countdown do it

Keep a project from Pick my project and add your fair date. The countdown spreads the five jobs over your days and shows today's job. If the plan is tight, it says so, while there's still time to pick a shorter project.

👨‍👩‍👧 For grown-ups and teachers: how much to help, the safety rules, and running a school fair. Science fair v0.16.1 · Checked .

For grown-ups: Peabody has no ads, not one, and nothing to sell your child. The Kids Pick, an independent kids' directory, rates its games 90/100. See what other free kids' sites load · Grown-ups, sign in · Already have a profile?